Phase II: is a 235,000 HP system producing 68.25MW’s of stored energy.

The construction will take place in the same location and by the same companies as Phase I but will not need another anchoring system or re-gas facility.Another 12 Rimdrive wind machines and 12 cryogenic platform tanks will be produced and delivered as was in Phase I. The wind machines and platform tanks will be towed to and installed on the Phase I wind farm making it a 175MW/235,000 HP wind farm to produce approximately 68.25 MW’s of electricity (allowing for a wind factor of 39%).

It is reasonable to assume, considering economy of scale and competitive bidding, that the price of future systems will be 10 to 20% lower than those of phase I and II.